ALT-198: The Alternator Testing System For The Future

ALT-198: The Alternator Testing System For The Future


Building from sixteen years of ALT-98
testing history, D&V Electronics has designed and
engineered the all-new ALT-198 Faster, MORE Efficient More Powerful D&V’s ALT-198 incorporates significant
advancements in technology. Fully integrated software environment advanced and basic modes are complemented
by detailed Digital scopes for all signals with network connectivity to the
cloud. Sampling at the speed of 200 kHz greatly reduces the testing time. Built in logic includes learning
mode and recognition of LIN and COM
protocols. Equipped with D&V’s Regenerative
load bank system, the ALT-198 saves power, lowers cost and reduces heat by recovering energy
from the alternator output. Available with 11 or 22 kilowatt motors, 300 or 600 amp regen load banks. The ALT-198…FASTER, MORE Efficient, More powerful… D&V
Electronics… TESTING THE FUTURE®

Leave a Reply

Your email address will not be published. Required fields are marked *